EICHINGER CONCRETE COLUMN POURING SKIP

$3,502.80

Specifically designed to pour concrete into formwork1000L capacityEasily direct the pouring location with the attached hoseSpecial safety features and easy cleaning design

SKU: LIF87124
Category: , , ,
Tags:

Description

Designed specifically for pouring concrete into formwork is the Concrete Column Pouring Skip from Eichinger. Robust manufacturing provides a final product fit for on-site use in construction and building sites. Complete with a flexible delivery hose attached via the gate our concrete pouring skip offers a capacity of 1000L at a weight capacity of 2400kg. The hose can be detached for pouring larger slabs. It’s worth noting that we do offer alternative sizes available upon request. 

Reviews

There are no reviews yet.

Be the first to review “EICHINGER CONCRETE COLUMN POURING SKIP”

Your email address will not be published. Required fields are marked *